UNIVERSITY OF CALIFORNIA
OFFICE OF THE PRESIDENT
FACILITIES MANUAL
VOLUME 5
TABLE OF CONTENTS
PART I: BIDDING
-
Chapter 1 Methods of Contractor Selection
- INTRODUCTION
- 1.1 COMPETITIVE BIDDING
- 1.1.1 Formal vs Informal Competive Bidding
- 1.1.2 Federally Funded Projects
1.2 NOT USED
- 1.3 NEGOTIATED CONTRACTING
- 1.4 DURATION OF THE BIDDING PERIOD
- 1.5 EQUAL OPPORTUNITY POLICY
- 1.5.1 Outreach
- 1.5.2 Certification
- 1.5.3 Statistical Records
-
- INTRODUCTION
- 2.1 BIDDING DOCUMENT TYPES
- 2.2 BIDDING DOCUMENT REVIEW
-
Chapter 3 Preparing to Solicit Bids
- INTRODUCTION
- 3.1 CONDITIONS PREREQUISITE TO BIDDING
- 3.2 AVAILABILITY OF FUNDS
- 3.2.1 State-Funded Projects
- 3.2.2 Non-State Funded Projects
- 3.3 CONCURRENT APPROVAL BY FUNDING AGENCY
- 3.3.1 State-Funded Projects
- 3.3.2 Lease-Revenue Bond-Funded Projects
- 3.4 PROJECT FILE MAINTENANCE
- 3.5 COMPLIANCE WITH STATE AND FEDERAL LAW OR
REGULATION
Chapter 4 Determining Bidder Responsibility
- INTRODUCTION
- 4.1 RESPONSIBILITY: ORIGIN AND POLICY
- 4.2 STANDARD BIDDING DOCUMENT REQUIREMENTS
- 4.3 PREQUALIFICATION
- 4.3.1 Prequalification Guidelines
- 4.3.2 Contractor Prequalification Procedures
- 4.3.3 Subcontractor Prequalification Procedures
- 4.4 QUALIFICATION
- 4.4.1 Qualification Guidelines
- 4.4.2 Qualification Procedures
- 4.5 DISQUALIFICATION
- 4.5.1 Disqualification Guidelines
- 4.5.2 Disqualification Procedures
-
- INTRODUCTION
- 5.1 SOLICITING FORMAL COMPETITIVE BIDS
- 5.1.1 Advertising for Bids
- 5.1.2 Issuing Bidding Documents
- 5.1.3 Pre-Bid Conference
- 5.1.4 Modification or Withdrawal of Bids Before
the Bid Deadline
- 5.1.5 Procedure for Selection of Alternates
- 5.2 SOLICITING INFORMAL COMPETITIVE BIDS
- 5.2.1 Withdrawal of Bids Before the Bid Deadline
- 5.3 ADDENDA
-
Chapter 6 Receiving and Opening Bids
- INTRODUCTION
- 6.1 BID DEADLINE
- 6.2 RECEIVING COMPETITIVE BIDS
- 6.2.1 Bid Submittal Requirements
- 6.2.2 Facility Procedures
- 6.2.3 Modification or Withdrawal of Bids
After the Bid Deadline
- 6.3 OPENING COMPETITIVE BIDS
- 6.3.1 Facility Procedures
- 6.4 RECEIVING INFORMAL BIDS
- 6.4.1 Bid Submittal Requirements
- 6.4.2 Facility Procedures
- 6.4.3 Withdrawal of Bids After the Bid Deadline
- 6.5 OPENING INFORMAL BIDS
- 6.5.1 Facility Procedures
-
Chapter 7 Reviewing and Evaluating Bids
- INTRODUCTION
- 7.1 RESPONSIVE AND NONRESPONSIVE BIDS
- 7.1.1 Bid Irregularities
- 7.2 BID PROTESTS
- 7.3 EVALUATING BIDS
- 7.3.1 Preparing the Bid Summary
- 7.3.2 Alternates
- 7.3.3 Separate Bids and Combined Bids
- 7.4 DETERMINING THE LOWEST RESPONSIBLE BIDDER
- 7.5 REJECTION OF ALL BIDS
-
Chapter 8 Executing and Awarding the Contract
- INTRODUCTION
- 8.1 CONDITIONS PREREQUISITE TO CONTRACT EXECUTION
AND AWARD
- 8.2 CONCURRENT APPROVAL OF AWARD BY FUNDING
AGENCY
- 8.2.1 State-Funded Projects
- 8.2.2 Projects Under Department Of Energy
Contracts
- 8.2.3 Federally or Non-State-Funded Projects
- 8.3 FUNDING OF RELATED CONSTRUCTION OR EQUIPMENT
- 8.4 NOTIFYING THE LOWEST RESPONSIBLE BIDDER
- 8.4.1 Forfeiture of Bid Bond
- 8.5 REQUIRED BIDDER SUBMITTALS
- 8.5.1 Performance and Payment Bonds
- 8.5.2 Certificates of Insurance
- 8.5.3 Contractor's Statement of Experience
and Financial Condition
- 8.6 EXECUTING THE CONTRACT
- 8.6.1 Corporate Seal and Attest
- 8.7 AWARDING THE CONTRACT
- 8.7.1 Document Maintenance Before Award
- 8.7.2 Custody of Construction Documents
- 8.7.3 Reporting the Award to the Office of
the President
- 8.8 EARLY START OF CONSTRUCTION
- 8.9 NOTICE TO PROCEED
- 8.10 RECORDING THE CONTRACT DOCUMENTS
-
- INTRODUCTION
- 9.1 BID PROTESTS
- 9.1.1 Filing a Bid Protest
- 9.1.2 Facility Review of the Protest
- 9.1.3 Construction Review Board Appeal
-
Chapter 10 Contractor Substitution Durinig The Bidding Period
PART II: CONSTRUCTION ADMINISTRATION
-
Chapter 1 Contract Administration
- INTRODUCTION
- 1.1 CONTRACT ADMINISTRATION RESPONSIBILITY
AND POLICY
- 1.1.1 The University and the University's
Representative
- 1.1.2 Facility Responsibilities
- 1.1.3 Keeping a Project File
- 1.1.4 Administration of Projects Funded
by Federal Grants
- 1.2 PRECONSTRUCTION CONFERENCE (KICK-OFF)
- 1.3 SUBMITTALS
- 1.3.1 Schedules
- 1.3.2 Shop Drawings
- 1.3.3 Product Data and Samples
- 1.3.4 Test Reports
- 1.3.5 Requests for Substitution of Materials
and Equipment
- 1.4 ASSIGNMENTS
- 1.5 SUBSTITUTION OF SUBCONTRACTORS AFTER
CONTRACT AWARD
- 1.5.1 Authorized Grounds for Consenting
to a Contractor's Request for Substitution
- 1.5.2 Procedures for Substitution Requests
on Grounds Other Than a Clerical Error
- 1.5.3 Consent Does Not Change the Contract
- 1.5.4 Failure to Specify a Subcontractor
- 1.5.5Penalty for Violating Fair Practices
Act Provisions
- 1.6 INSURANCE AND BONDS
- 1.6.1 Payment Bond
- 1.6.2 Performance Bond
- 1.6.3 Liability Insurance
- 1.6.4 Builder's Risk Property Insurance
and Loss Reporting
-
Chapter 2 Field Administration
- INTRODUCTION
- 2.1 FIELD OBSERVATION
- 2.2 INSPECTION POLICY AND RESPONSIBILITY
- 2.2.1 Allocating Inspection Responsibility
- 2.2.2 Basic Inspection Staff
- 2.2.3 Geotechnical Engineering and Inspection
- 2.2.4 Hospital Safety Standards and Inspection
- 2.3 TESTING
- 2.4 SURVEYING
- 2.5 PROJECT PROGRESS MEETINGS
- 2.6 RESPONSIBILITY FOR SAFETY
-
Chapter 3 Contract Modifications
- INTRODUCTION
- 3.1 FIELD ORDERS
- 3.1.1 Payment for Work Directed by a Field
Order
- 3.2 CHANGE ORDERS
- 3.2.1 Cost Proposals
- 3.2.2 Change Order Execution
- 3.2.3 Change Orders and Beneficial Occupancy
- 3.2.4 Change Orders and the Notice of Completion
- 3.2.5 Contractor Disapproval of Change
Orders
- 3.2.6 Substantial Changes to the Work After
Contract Award
- 3.2.7 Guidelines for Substantial Change
Orders
- 3.2.8 Change Orders Changing the Scope
of Work
- 3.2.9 Change Orders for Post-Award Alternates
- 3.2.10 Authority Needed to Negotiate and
Execute Change Orders
- 3.3 MODIFICATION OF CONTRACTUAL CONDITIONS
- 3.4 TIME EXTENSIONS RESULTING FROM DELAYS
- 3.4.1 Guidelines For Granting Time Extensions
Resulting From Delays
- 3.5 TIME EXTENSIONS RESULTING FROM FACTORS
OTHER THAN DELAYS
-
Chapter 4 Project Monitoring
- INTRODUCTION
- 4.1 MONITORING THE CONTRACT SCHEDULE
- 4.2 STATUTORY REQUIREMENTS
- 4.2.1 Prevailing Wage Rates
- 4.2.2 Payroll Records
- 4.2.3 Employment of Apprentices
- 4.3 HOSPITAL REQUIREMENTS
- 4.3.1 OSHPD Requirements
- 4.3.2 Special Additional Hospital Requirements
-
Chapter 5 Contractor Payments
- INTRODUCTION
- 5.1 COST BREAKDOWN
- 5.2 PROGRESS PAYMENTS
- 5.3 APPLICATION FOR PAYMENT
- 5.4 CERTIFICATE FOR PAYMENT
- 5. RETENTION
- 5.5.1 Normal Retention
- 5.5.2 Securities In Lieu of Retention and
Deposit of Retention Into Escrow
- 5.5.3 Release of Retention
- 5.6 LIQUIDATED DAMAGES
-
- INTRODUCTION
- 6.1 CONTRACTOR CLAIMS
- 6.2 CONDITIONS FOR MAKING A CLAIM
- 6.2.1 Change Order Requests
-
- 6.3 NEGOTIATION
- 6.3.1 Decision on Claims
- 6.4 MEDIATION
- 6.5 ARBITRATION
- 6.6 LITIGATION
-
Chapter 7 Beneficial Occupancy and Substantial
Completion
- INTRODUCTION
- 7.1 TAKING BENEFICIAL OCCUPANCY
- 7.2 DETERMINING SUBSTANTIAL COMPLETION
- 7.3 ENDING BUILDER'S RISK INSURANCE
- 7.4 REDUCING LIQUIDATED DAMAGES AFTER SUBSTANTIAL
COMPLETION
-
- INTRODUCTION
- 8.1 AS-BUILT DOCUMENTS
- 8.2 OPERATING AND MAINTENANCE DATA
- 8.3 GUARANTEES
- 8.3.1 Special Guarantees
- 8.4 FINAL COMPLETION
- 8.5 NOTICE OF COMPLETION
- 8.6 STOP NOTICES
-
- INTRODUCTION
- 9.1 FINAL BUDGET
- 9.2 CLOSEOUT OF PROJECTS FUNDED BY FEDERAL
GRANTS
- 9.3 CORRECTION OF DEFECTIVE WORK
- 9.3.1 Patent and Latent Defects
- 9.3.2 Reporting Defects and Deficiencies
- 9.3.3 Personal Injury Caused by Inadequate
Design or Poor Construction
- 9.3.4 Post Construction Meeting
-
Chapter 10 Project Quality Management Program
- INTRODUCTION
- 10.1 PROGRAM GOALS
- 10.1.1 Project Team Members
- 10.2 PROGRAM SCOPE
- 10.3 PROGRAM REQUIREMENTS AND PROCEDURES
- 10.4 TEAMWORK
- 10.4.1 Partnering
- 10.5 PROGRAM RESOURCES
- 10.6 EVALUATION BY THE PROJECT TEAM
RESOURCE DIRECTORY (RD)
- RD1: Figures
- RD2: Models
- RD3:
Glossary
- RD4: University Policies
- RD5: Bibliography
- RD6: Attachments
- FACILITIES MANUAL
Back to the Facilities Manual Home Page
Send questions, comments, or suggestions to
Last Updated February 3, 2006