PART I: CONSTRUCTION CONTRACTING AND CONSTRUCTION DOCUMENTS
-
Chapter 1 Construction Contracting
- INTRODUCTION
- 1.1 REQUIRED MODES OF CONTRACTING
- 1.1.1 Complete Plans and Specifications Mode
- 1.1.2 Design-and-Build Mode
- 1.1.3 Construction Manager Mode
- 1.1.4 Cost-Plus-Fee Mode
- 1.1.5 Other Contracting Modes
- 1.2 TYPES OF CONSTRUCTION CONTRACTS
- 1.2.1 The Single Contract and Multiple Prime Contracts
- 1.3 TYPES OF CONSTRUCTION DOCUMENTS
- 1.3.1 Long Form
- 1.3.2 Short Form
- 1.3.3 Brief Form
- 1.4 CONSTRUCTION TEAM
- 1.4.1 University
- 1.4.2 Contractor
- 1.4.3 University's Representative
- 1.4.4 Design Professional
- 1.4.5 Construction Manager
- 1.4.6 Project Manager
- 1.5 METHODS OF DETERMINING THE CONTRACT SUM
- 1.5.1 Lump Sum Method
- 1.5.2 Cost-Plus-Fee Method
- 1.5.3 Unit Prices Method
-
Chapter 2 Construction Document Organization
- INTRODUCTION
- 2.1 CONSTRUCTION DOCUMENT FORMAT
- 2.2 CORE DOCUMENTS AND NON-CORE DOCUMENTS
- 2.3 CONTRACT DOCUMENTS
-
Chapter 3 Selecting the Type of Construction Documents
INTRODUCTION
- 3.1 ESTIMATED CONTRACT SUM
- 3.1.1 General Dollar Limitations
- 3.1.2 Federally Funded Projects
- 3.1.3 Lowest Informal Bid Exceeds $100,000
- 3.1.4 Equipment Purchases and Installation
- 3.2 CONTRACTOR SELECTION METHOD
-
Chapter 4 Preparing Individual Construction Documents
- INTRODUCTION
- 4.1 COVER SHEETS AND INSTRUCTIONS
- 4.2 GENERAL PREPARATION INSTRUCTIONS
- 4.3 INTRODUCTORY PAGES
- 4.3.1 Cover Page
- 4.3.2 Certification
- 4.3.3 Table of Contents
- 4.4 BID SOLICITATION
- 4.4.1 Request for Bid
- 4.4.2 Advertisement for Bids
- 4.4.3 Project Directory
- 4.5 BIDDING REQUIREMENTS
- 4.5.1 Instructions to Bidders
- 4.5.2 Supplementary Instructions to Bidders
- 4.5.3 Information Available to Bidders
- 4.5.4 Bid Form
- 4.5.5 Bid Bond
- 4.6 CONTRACT DOCUMENTS
- 4.6.1 Agreement
- 4.6.2 General Conditions
- 4.6.3 Supplementary Conditions
- 4.6.4 Exhibits
- 4.6.5 Specifications
- 4.6.6 List of Drawings
- 4.6.7 Drawings
- 4.6.8 Addenda
- 4.6.9 Notice to Proceed
- 4.6.10 Change Order
- 4.6.11 Field Order
- 4.6.12 Notice of Completion
-
Chapter 5 Modifying the Construction Documents
- INTRODUCTION
- 5.1 IMPROVEMENTS TO THE CONSTRUCTION DOCUMENTS
- 5.1.1 Interim Improvements Made by Letter
- 5.2 DOCUMENT CHANGES RELATED TO CONTRACTING MODE
- 5.2.1 Using the Complete Plans and Specifications Mode
- 5.2.2 Modifications for the Design-and-Build Mode
- 5.2.3 Modifications for the Construction Manager Mode
- 5.2.4 Modifications for the Cost-Plus-Fee Mode
- 5.2.5 Modifications for Other Contracting Modes
- 5.3 SPECIAL PROJECT APPLICATIONS
- 5.3.1 Federally Funded Projects
- 5.3.2 State Revenue Bond-Financed Projects
- 5.4 SPECIAL PROJECT CIRCUMSTANCES
- 5.4.1 Allowances
- 5.4.2 Alternates
- 5.4.3 Asbestos Abatement
- 5.4.4 Assignments
- 5.4.5 Bidder Prequalification
- 5.4.6 Bidder Qualification
- 5.4.7 Code Requirements, Optional
- 5.4.8 Early Completion Bonus
- 5.4.9 Construction Sequence
- 5.4.10 Contractor's Statement of Experience and Financial Condition
- 5.4.11 Hospital Projects
- 5.4.12 Incremental Funding of Single Lump-Sum Contracts
- 5.4.13 Irrevocable Bid Period, Changing
- 5.4.14 Daily Rate of Compensation for Compensable Delays
- 5.4.15 Phased Construction and Multiple Liquidated Damages
- 5.4.16 Separate Bids and Combined Bids
- 5.4.17 Separate Contracts
- 5.4.18 Soil and Subsurface Conditions
- 5.4.19 Soils Engineer
- 5.4.20 Specialty Contractors
- 5.4.21 Trenching and Excavating
- 5.4.22 Unit Prices
- 5.4.23 Use of Common Site
-
Chapter 6 Construction Documents Review Procedures
- INTRODUCTION
- 6.1 UNIVERSITY REVIEWS
- 6.1.1 Facility Reviews
- 6.1.2 Office of the President and Office of the General Counsel
- 6.2 EXTERNAL REVIEWS
- 6.2.1 Division of the State Architect
- 6.2.2 Office of the State Fire Marshal
- 6.2.3 Office of Statewide Health Planning and Development
- 6.2.4 Coastal Commission
- 6.2.5 Air Quality Management Districts
- 6.2.6 Federal Agencies
- 6.2.7 Joint Commission on Accreditation of Heathcare Organizations
-
Chapter 7 Project Quality Management Program
- INTRODUCTION
- 7.1 PROGRAM GOALS
- 7.1.1 Project Team Members
- 7.2 PROGRAM SCOPE
- 7.3 PROGRAM REQUIREMENTS AND PROCEDURES
- 7.4 TEAMWORK
- 7.4.1 Partnering
- 7.5 PROGRAM RESOURCES
- 7.6 EVALUATION OF THE PROJECT TEAM
-
RESOURCE DIRECTORY (RD)
- RD1: Figures
- RD2: Models
- RD3: Glossary
- RD4: University Policies
- RD5: Bibliography
- RD6: Attachments
PART II: CONSTRUCTION DOCUMENTS MODELS AND INSTRUCTIONS
- Long Form Construction Documents
(Individual documents are listed in the Long Form, Table of Contents)
- Brief Form Construction Documents
(Individual documents are listed in the Brief Form, Table of Contents)
- Mini Form Construction Documents
- CM at Risk Documents
- Design Build Contract Documents
- JOC Contract Documents
- FACILITIES MANUAL
Revision March 10, 2008 (Change No. 08-094-D)