UNIVERSITY OF CALIFORNIA
OFFICE OF THE PRESIDENT
FACILITIES MANUAL
VOLUME 2
PLANNING
TABLE OF CONTENTS
-
Chapter 1 Academic and Enrollment Planning
- INTRODUCTION
- 1.1 ACADEMIC PLANNING
- 1.1.1 Academic Program Approval
- 1.1.2 Design and Planning Issues
- 1.2 ENROLLMENT PLANNING
- 1.2.1 Undergraduate Enrollment
- 1.2.2 Graduate Enrollment
- 1.2.3 Health Sciences Enrollment
-
- INTRODUCTION
- 2.1 SPACE PLANS
- 2.1.1 Overall Objective
- 2.1.2 Building Status and Potential
- 2.1.3 Program Requirements
- 2.1.4 Possible Approaches to the Space Plan
-
Chapter 3 Long-Range Development Plans
- INTRODUCTION
- 3.1 LONG-RANGE DEVELOPMENT PLAN (LRDP)
- 3.1.1 LRDP Organization
- 3.1.2 LRDP Elements
- 3.1.3 LRDP Organizing Concepts
- 3.1.4 Environmental Impact Report
- 3.1.5 LRDP Approval and Updating Process
-
Chapter 4 Ancillary Area Planning
- INTRODUCTION
- 4.1 PRECINCT OR AREA PLANS
- 4.1.1 Guidelines for Implementation
- 4.2 INCLUSION AREAS
- 4.2.1 Off-site Properties
-
Chapter 5 Environmental Issues
- INTRODUCTION
- 5.1 CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
COMPLIANCE
- 5.2 ENVIRONMENTAL DOCUMENTATION
- 5.2.1 Environmental Impact Classification
Form
- 5.2.2 General Exemption
- 5.2.3 Categorical Exemption
- 5.2.4 Initial Study
- 5.2.5 Tiered Initial Study
- 5.2.6 Negative Declaration
- 5.2.7 Mitigated Negative Declaration
- 5.2.8 Environmental Impact Report
- 5.2.9 Findings
- 5.3 ENVIRONMENTAL HEALTH AND SAFETY LIAISON
- 5.4 FIRE MARSHAL AND FIRE AND LIFE SAFETY ISSUES
-
- INTRODUCTION
- 6.1 PRE-DESIGN
- 6.2 SITE ANALYSIS
- 6.2.1 Geotechnical Reports
- 6.2.2 Hydrology Studies
- 6.23 Land Surveys
- 6.3 EXISTING BUILDING ANALYSIS
- 6.4 SURVEYS OF EXISTING HAZARDOUS MATERIALS
(DUE DILIGENCE)
- 6.5 DATA COMPILATION
- 6.5.1 Site Analysis Report
- 6.5.2 Site Analysis Drawing
- 6.5.3 Comparative Site Analysis
- 6.6 FACILITY AND INFRASTRUCTURE ANALYSIS
- 6.7 PROGRAMMING
- 6.7.1 Programming Objective
- 6.7.2 The Project Program
- 6.8 CONSTRUCTION COSTS
- 6.8.1 Sources of Cost Information
- 6.8.2 Methods of Estimating Costs
- 6.8.3 Contingencies
- 6.8.4 Preparing the Construction Cost Estimate
- 6.8.5 Cost Indexing
Chapter 7 Capital Planning Overview
[In development]
Chapter 8 State-Funded Capital Program
[In development]
Chapter 9 Non-State Capital Program
[In development]
RESOURCE DIRECTORY (RD)
- RD1: Figures
- Figure 1 - EH&S Guidance Checklist - Project
Planning Phase
- Figure 2 - Fire Marshall Guidance Checklist
- Project Planning Phase
- Figure 3 - Site Analysis Data Compilation
Categories
- RD2: Models
- RD3:
Glossary
- RD4: University Policies
- RD5: Bibliography
- RD6: Attachments
- FACILITIES MANUAL
Back to the Facilities Manual Home Page
Send questions, comments, or suggestions to fadweb@ucop.edu
Last Updated February 13, 1996